The Indonesia
Urban Water Sanitation and Hygiene (IUWASH) project is a sixty-month program
(2011 – 2016) funded by the United States Agency for International Development
(USAID) and implemented under the leadership of DAI. IUWASH works with
government, the private sector, NGOs, community groups and other stakeholders
to improve access to safe water supply and sanitation in Indonesia’s urban
areas. The overall goal of IUWASH is to assist the Government of Indonesia
(GOI) in making significant progress in achieving its safe water and sanitation
Millennium Development Goal (MDG) targets by expanding access to these
services.
To achieve the
above, assistance provided by the project is divided under three main technical
components, including:
- Mobilizing demand for WatSan service delivery;
- Improving and expanding capacity for WatSan service delivery; and
- Strengthening policy and the financial enabling environment for improved water supply and sanitation service delivery.
IUWASH will apply
different approaches and interventions with its local partners, such as local
Water utilities, local and national government institutions, NGOs and
communities to address water, sanitation and hygiene. To achieve these
objectives IUWASH need high caliber incumbent to fill the positions of
Name of Position: WATER DISTRIBUTION
NETWORK SPECIALIST
Job Code: WDNS-TNG
Type of Employment: Short Term
Technical Assistance (STTA)
Total Level of Effort: 50
days LOE
Location: Tangerang
Background STTA Assignment
Under Partnership of Agreement between
The Government of Kabupaten Tangerang with IUWASH, mentioned that Government of
Kabupaten Tangerang and IUWASH share common roles in an effort to improve urban
water and sanitation. One of the common role is IUWASH provide technical
assistance to Perusahaan Daerah Air Minum Tirta Kerta Raharja (PDAM TKR) Kabupaten
Tangerang, an entity that owned by The Government of Kabupaten Tangerang. One
of assistance that can be provided by IUWASH is the study of distribution pipe network
analysis in Service Areas 1, 2 and 3.
PDAM TKR has 120,780 customers (March
2014). PDAM TKR plans to increase service coverage and develop services in
Service Areas 1, 2 and 3, where
customers are mixed from low-income communities, housing estates and commercial
customers. In these areas, PDAM TKR will increase about 24,000 customers. For
the above plan, the
addition of water capacity will be
required. The addition of water
capacity will be filled by
uprating of 300 liters/second of the WTP Cikokol (from 1,275 liters/second will be uprated to
1,575 liters/second). The WTP uprating
will be implemented and financed by private partner of PDAM (PT. Tirta Kencana
Cahaya Mandiri).
With the large increase in the number
of customers and also with low pressure and high in NRW number (35%) condition,
it would require a study of distribution pipe network analysis in Service Area 1,
2 and 3. This study will be conducted to determine the ability of the existing piping
network conditions in areas of study related to additions of 24,000 customers. This
study is also to determine what steps needed to reduce the number of NRW. PDAM
TKR is committed to implementing what will be recommended by the study. PDAM
TKR will finance it with its own funds.
Objectives
To optimize the planning and
development of existing primary and secondary distribution pipeline network of PDAM Tirta
Kerta Raharja Kabupaten Tangerang in Service Area 1, 2 and 3 in anticipation of
additional 24.000 customers and to support their plans to increase production capacity of water, so the water distribution
services to customers can be
improved and better to meet the applicable standard of
good quantity, quality, continuity
and water pressure.
SCOPE
OF WORK
The scope of work of this
activity consists of:
1. Task I : Preparation
- Conduct preliminary discussions with IUWASH and PDAM TKR Kab. Tangerang in order to prepare a work plan and report of the preliminary work
- Prepare a detailed work plan (inception report)
- Make coordination, initial discussions and give presentations about the implementation of the work plan to the management/technical team of PDAM TKR Kab. Tangerang.
2. Task II : Data
Gathering
- Collect secondary and primary data related to this work, including an overview of the data of Service Area 1, 2 and 3 PDAM TKR Kab. Tangerang, the existing water supply system, including raw water sources, production units and reservoir, pipeline systems and data on transmission/distribution pipelines, existing service areas, number of customer/ house connections, volume of current production and distribution, volume of water sold and non-revenue water, regional development plans for service expansion, water production units, zoning services, system/distribution pipelines, as built drawings of the distribution pipelines, etc.
3. Task III : Evaluation and
Analysis on the Existing Distribution Pipeline Network
- Analysis of water production and distribution of water and the number of connections and water usage in each service area in Service Area 1, 2 and 3
- Conduct analysis of non-revenue water
- Develop criteria to be used in this study, including the criteria for primary and secondary piping system, water flow rate and minimum and maximum water pressure in the primary and secondary pipes, etc.
- Evaluate the ability of existing distribution pipeline and discharge, velocity and residual water pressure in pipelines, primary and secondary pipe using hydraulic analysis
- Evaluate existing zoning system (if any)
- Evaluate condition of existing distribution pipes, including pipe material type, age / condition of the pipe, the diameter and length of pipe, pipe and other locations as needed within the material consideration in determining the need for the pipes to be replaced/rehabilitated
- Evaluate the number of Non-Revenue Water (NRW)
- Evaluation of completeness of the available as built drawings on distribution pipelines
- Prepare Interim Report
4.
Task
IV : Plan for Optimalization and Development of Primary & Secondary Distribution
Pipeline
- Plan the optimalization and development of existing primary and secondary distribution pipeline for the period of 15 years ahead, or at least in accordance with the plan period for utilization of production unit in question.
- Plan the zoning distribution system each service area in Service Area 1, 2 and 3 to be in the most efficient manner
- Make projection on number of population served and number of connections in each service area in Service Area 1, 2 and 3.
- Make analysis of capacity and service area during the planning period
- Provide calculation of hydraulic distribution pipelines. Distribution pipe network hydraulic calculation should be done several times in accordance with the plan of distribution pipeline stages of development (eg calculated for every 5-year based on water demand), so that the development of distribution pipeline network can be done in stages while still meeting the requirements of hydraulic calculations
- Provide steps needed to reduce the number of NRW
- Develop plans and program development pipeline stages of primary and secondary distribution, including the type of activity, location and volume of activity, unit price, cost estimates and implementation plan year In the preparation of this program the followings needs to be described in detail:
- Pipe replacement (where, what material,
diameter, length of pipe)
- Laying new pipeline
- Block renovation
- etc
5. Task V : Preparing Program Plan
and Cost Estimate
At this stage the
consultant shall develop a program plan and stages of development for the primary
and secondary distribution pipeline, including types of activity, location and
volume of activity, unit price, cost estimates and year-by-year implementation
plan. In the preparation of this program the followings needs to be described
in detail:
- Pipe replacement (where, what material,
diameter, length of pipe)
- Laying new pipeline
- Block renovation
- etc
In addition, in
this stage the consultant is expected to
- Prepare the Draft Final report
- Make Presentation on the Final Report to PDAM TKR Kab. Tangerang.
6. Task VII : Report Finalization
- Prepare their final report as the revision on the Draft Final Report based on input and feedback during the presentation and discussion of the Final Report
7. Task VII : General
- Regularly coordinate with PDAM TKR Kab. Tangerang and if necessary shall be together with IUWASH team
- Maintain coordination with IUWASH team, especially the Urban Water Specialist
QUALIFICATION
- A university degree in Environmental or Civil Engineering
- At least 8 years of relevant professional experience in urban water supply with strong focus on planning, design, operation & maintenance, analyzing of technical matters, particularly on water distribution pipeline network
- Understand how to operate EPANET software
- Strong English writing and speaking skills
- Experience with USAID or other donor programs is highly desirable.
APPLICATION SEND
Interested
applicants are invited to send a complete application with 3 references to IUWASH.recruitment@gmail.com by latest 2 (two) weeks of
the advertisement. Please write the
job CODE in the subject line of the email. We regret that we are
unable to acknowledge receipt of all applications and only shortlisted
candidates will be notified.
loading...